Tighten the two copper nuts on the two large solenoid terminals. In the unlikely event that doesn't help, use a test light or voltmeter to measure the voltages on those two studs. One is connected to the battery positive post and will have 12 volts all the time. The other one is the one we need to measure. It should have voltage when the solenoid clicks.
caradiodoc
Feb 2, 2011 at 3:29 AM